Redlands area residents are concerned that the City of Grand Junction and Colorado Department of Public Health and Environment (CDPHE) have give preliminary approval to build a huge sewage lift station on private land in a geographically unstable area, and they are warning of its potential for failure and environmental catastrophe.
The proposed lift station will replace a 6-foot diameter lift station said to be “reaching the end of its useful life” at the Ridges Subdivision, and consolidate a 4-foot diameter lift station that “is in adequate condition” on Power Road. The proposed budget for this new lift station is currently $7.1 million.
But homeowners in the area contend the new lift station and sewer lines will be built on unstable land, will destroy huge swaths of riparian habitat above Connected Lakes State Park and, in the event of a failure, could lead to huge amounts of raw sewage being dumped into the river.